EasyManua.ls Logo

BRP Evinrude E-TEC G2 - Page 268

BRP Evinrude E-TEC G2
460 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
268
Powerhead
Powerhead Installation
Port
Install the following:
1. The DPS module and cooling hose assembly.
Install the following hoses and hose clamps:
2. The DPS module cooling hose to the tee fitting,
secure with a new 15.7 mm Oetiker clamp.
3. The exhaust cooling hose (DPS module to
exhaust adapter) to the adapter fitting, secure
with a new 15.7 mm Oetiker clamp.
4. The Y-fitting to the exhaust adapter hose,
secure with a new 34.6 mm Oetiker clamp.
5. The thermostat hose to the exhaust adapter fit-
ting, secure with a new 21.0 mm Oetiker
clamp.
6. The exhaust back pressure hose to the
exhaust adapter fitting, secure with a new tie
strap.
Connect the electrical connectors to the following:
7. Exhaust temperature sensor
8. Shift actuator
9. DPS module
009175
2
3
5
7
6
9
1
7
4

Table of Contents

Other manuals for BRP Evinrude E-TEC G2

Related product manuals