EasyManua.ls Logo

BRP Evinrude E-TEC G2 - Control Systems Overview

BRP Evinrude E-TEC G2
460 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
29
Routine Service
Lifting The Outboard
2
complete engine. The off-set lifting eye is used to
remove and install the powerhead.
IMPORTANT: Carefully thread the lifting fixture
into the threads of the flywheel at least 6 complete
turns. Do NOT cross-thread the threads of the lift-
ing fixture into the threads of the flywheel.
Install the lifting fixture completely into the fly-
wheel. If needed, turn the flywheel until the lifting
rings of the fixture are aligned front to back as
shown.
Fasten appropriate chain hook to the centerline
lifting eye of the tool.
Plug Installation
Install the following plugs from the Owner’s Kit:
1. Apply Triple Guard grease to the threads of the
flywheel. Then install the Flywheel Thread
Plug, P/N 357323 to protect the threads from
corrosion.
Lifting Fixture, P/N 357667
1. Centerline lifting eye
2. Off-set lifting eye
357667
1. Fixture aligned front to back
009100
2
1
Back
Front
1
1. Centerline lifting eye
009100
NOTICE
Install plugs as indicated. Plugs MUST be
installed to prevent water entry and/or engine
performance issues.
1. Flywheel thread protector
009102
1
1

Table of Contents

Other manuals for BRP Evinrude E-TEC G2

Related product manuals