D 41 3
Before starting work
(in the morning or when starting paving)
- Heed the safety instructions.
- Check the personal protective equipment .
- Take an inspection walk around the paver finisher and check for leaks and
damages.
- Install parts removed for transportation or for the night.
- When screed is operated with the optional gas heating system, open the closing
valves and the main shut-off valve.
- Perform the check according to the "Checklist for the vehicle operator" given below.
Check list for the vehicle operator
Check! How?
Emergency stop button
- on the operating panel
- on both remote controls
Push in the button.
The diesel engine and all running drives
must stop immediately.
Steering
The paver finisher must immediately fol-
low every steering wheel movement in a
precise manner. Check straight ahead
travel.
Horn
- on the operating panel
- on both remote controls
Briefly press the horn button.
Horn signal must sound.
Lights
Switch on with the ignition key, walk
around the paver finisher to check and
switch off again.
Screed hazard flasher
(with vario screeds)
With the ignition switched on, press the
switches for extending/retracting the
screed parts.
Hazard warning flashers must flash.
Gas heater system (o):
- Bottle holders
- Bottle valves
- Pressure reducer
- Hose break safety devices
- Shut-off valves
- Main shut-off valve
- Connections
- Indicator lamps of the switch box
Check:
- Secure seat
- Cleanliness and tightness
- Working pressure 1.5 bar
- Function
- Function
- Function
- Tightness
- All indicator lamps must light up when
the system is switched on