C 11 8
3.5 Preparing the machine
After the machine has been positioned on the low-bed trailer, the following prepara-
tions must be carried out:
- For movable platform: Set the retaining bolt properly (1).
- Close the hopper and set the hopper transport safeguards (2) on both sides.
- Position the non-slip mats under the screed across the whole width of the vehicle
(3) and lower the screed.
- Switch off the paver finisher.
- Attach and secure the protective hood (4) to protect the operating panel.
- Lower the roof and set the retainers (5) properly on both sides.
- Fold up the walkway plates of the screed and fasten on both sides using lashing
straps (6) and any possibly existing hook springs (7).