EasyManua.ls Logo

Dynapac SD2500C - 6 Transportation; 6.1 Preparations

Dynapac SD2500C
480 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
C 11 16
6 Transportation
m
Reduce the paver finisher and the screed to their basic widths; also remove any at-
tached side plates.
6.1 Preparations
- Prepare the paver finisher for transportation (see chapter D).
- Remove all overlaying or loose parts from finisher and screed (see also Operating
instructions for the screed). Store these parts in a safe place.
f
When the screed is operated with the optional gas heat-
ing system:
- Remove the gas bottles for the screed heating system:
- Close main shut-off valves and bottle valves.
- Turn off the valves on the bottles and remove the gas
bottles from the screed.
- Transport the gas bottles on a second vehicle; heed all applicable safety regula-
tions.

Table of Contents

Related product manuals