D 41 37
When work is finished
- Run the paver finisher empty and stop it.
- Lift the screed using switch (62), set the crossbeam lock.
- Retract the screed parts to the basic screed width and lift the auger. Where appli-
cable, completely extend the levelling cylinders.
- Close hopper halves, set hopper transport safeguards.
A
The screed is hydraulically secured in the lifted position.
- While operating the tampers at a low speed, let any material residues drop out.
- Set the drive lever (13) to the centre position and the speed adjuster (15) to
minimum.
- Switch the screed heater system off.
- Switch off the ignition (11).
- With a screed with gas heating system (o), close the main shut-off valves and the
bottle valves.
- Remove the levelling units and stow them away in the boxes, close all flaps.
- Remove all parts that extend beyond the paver finisher contour or secure them if
the paver finisher is to be transported over public roads on a low-bed trailer.
- Read and check the operating hour meter to determine whether maintenance work
must be performed (see chapter F).
- Cover and lock the operating panel.
- Remove material residues from the screed and the paver finisher and spray all
parts with separator fluid.