394149/C
147
Settingtoworksummary
Onceallthehardwareunitshavebeeninstalled,andallthecableshavebeenconnected,the
EK80canbepoweredupforthersttime,andsettowork.
Prerequisites
•AllEK80hardwareunitshavebeeninstalledaccordingtotherelevantinstructions.
•Allsystemcableshavebeeninstalled.
•Allconnectionshavebeenmade.
•Alloperatingpowerisavailable.
•AllperipheraldevicesthatshallcommunicatewiththeEK80areavailableand
operational.
•Allrelevantpersonnelandtoolsareavailable.
Procedure
1VerifythattheEK80isreadyforoperationaluse.
aVerifythatallhardwarehavebeeninstalledcorrectly.
bVerifythatallcableshavebeenconnectedcorrectly.
2PoweruptheEK80forthersttime.
aInstalltheEK80softwareandtherelevantsoftwarelicenses.
bDenetheIPaddressontheEthernetadapter.
cInstalltransducer(s)andfrequencychannel(s).
3Setuptheinterfacestoperipheraldevices.
Toprovidecorrectinformation,theEK80needstocommunicatewithexternaldevices.
AlltheseinterfacesmustbesetupintheEK80software.
4TesttheEK80operationalfunctionality.
ToverifythattheEK80fulllsalloperationalandfunctionalrequirements,specic
testsarerequired.
5CreateabackupwiththeEK80congurationandsoftwareinstallation.
OnceallEK80congurationandtestinghavebeennalized,itisgoodpracticetoback
upthecongurationdataandsoftwareinstallation.
6Fillinandsigntheinstallationapprovaldocument,andreturnittoSimrad.
Settingtowork