EasyManua.ls Logo

Simrad EK80 - Verifying that the EK80 Is Ready for Operational Use; Verifying that Operational Power Is Correct

Simrad EK80
254 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
148
394149/C
VerifyingthattheEK80isreadyforoperational
use
Topics
Verifyingthatoperationalpoweriscorrect,page148
Verifyingthatallcablesareproperlyconnected,page149
Visualinspectionofthedisplay,page150
VisualinspectionoftheProcessorUnit,page152
VisualinspectionoftheWideBandTransceiver(WBT),page153
Verifyingthatoperationalpoweriscorrect
TheEK80operatesonACpowerfromthevessel’smainssupply.BeforeyoucanapplyAC
powerupanyEK80unit,youmustverifythepoweriscorrect.
Prerequisites
AllEK80hardwareunitshavebeeninstalledaccordingtotherelevantinstructions.
Allsystemcableshavebeeninstalled.
Allconnectionshavebeenmade.
Alloperatingpowerisavailable.
Allrelevantpersonnel(shipselectrician)andtools(forexampleavoltmeter)areavailable.
Procedure
1ForeachEK80unitthatoperatesonACmains:
aVerifythattheunitisconnectedtoACmains.
bMeasurethevoltageandthefrequencyinthepoweroutlet,andmakesurethatthe
relevantEK80unitcanoperateonthispower.
cVerifythatthecircuitbreakeronthepowercircuitcanhandletheloadwhenthe
EK80ispoweredup.
2Ifirregularitiesarefound,writethesedownintheintheInstallationremarkstable.