EasyManua.ls Logo

Xerox WorkCentre 5230

Xerox WorkCentre 5230
1457 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
February, 2008
2-682
WorkCentre 5225, 5230
124-352, 124-353
Launch Version
Status Indicator Raps
124-352 CRUM OEM System 1 RAP
OEM (Original Equipment Manufacturer) CRUM control failed in system 1.
Procedure
Check the electrical connections on the ESS PWB and MCU PWB. The connectors are securely
connected.
YN
Connect the connectors.
Turn on the power again. The problem persists.
YN
Return to Service Call Procedures.
Perform GP 4, repair the problem by master MCU.
If the problem persists. replace the ESS PWB (PL 9.2).
124-353 CRUM OEM System 2 RAP
OEM (Original Equipment Manufacturer) CRUM control failed in system 2.
Procedure
Check the electrical connections on the ESS PWB and MCU PWB. The connectors are securely
connected.
YN
Connect the connectors.
Turn on the power again. The problem persists.
YN
Return to Service Call Procedures.
Perform GP 4, repair the problem by master SYS2.
If the problem persists, replace the ESS PWB (PL 9.2).

Table of Contents

Other manuals for Xerox WorkCentre 5230

Related product manuals