EasyManua.ls Logo

Amadas 9960 - Page 108

Default Icon
295 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation 9960 Self-Propelled Peanut Combine
98 06/03/05 MAN091
Pre-operation Checking
7. Inspect the tension of all belts and chains
(top and middle photos). Adjust as
needed. If the combine has been sitting
idle for some time, apply a small amount of
lubricant (chain lube or oil) to all chains.
8. Grease the basket pivot points and
driveline that connects the engine to the
main gearbox.

Table of Contents