Chapter 5
5.4 Cascaded systems
Figure 5.5: Principle of cascading using the LAN (option 1) or the cascaded network port
(option 2 - master ART Controller & DTrack2 => v2.11)
Additionally to the aforementioned figures, please proceed according to the following de-
scription:
1. mount the cameras as usual at the defined positions
2. connect all cameras to their corresponding controller as usual
3. establish a BNC connection between the master’s OUT1 connector and the EXT.In
of the slave(s) for synchronisation of cascade
Z
The ART Radio Transceiver for Flystick2 and Flystick3 has to be con-
nected to the master controller.
67