2COMMISSIONING
This chapter describes a specimen commissioning of a b maXX
multi-axis controller
BM5323 in conjunction with a BM5032 mains rectifier unit with a Baumüller DS56-S mo
-
tor.
Perform the commissioning to satisfy yourself that the supplied device is functioning prop-
erly.
This commissioning does not constitute a complete set-up of the device for your applica-
tion.
Before the commissioning, make sure that the technical requirements are met:
1 All points, including the installation, in the b maXX
5800 Operating Manual
(5.16027) have been followed.
2 Check of the requirements for the electrical supply.
3 Check of the requirements for the electrical cables and provision of appropriate ca-
bles.
4 Check of the characteristics of the connections and manufacture of the appropriate
cables.

Table of Contents