Chapter 6 Daily Routine
Flushing Flow Cell and Sample Line with
Sheath
The sample pump runs backward to move sheath
backward through flow cell and sample lines.
Instrument Started Up The instrument is ready to use.
Table 31. Steps in the startup process, continued
After startup, the status changes to Ready and the Shutdown button appears in the Login window
(if you have not logged in yet) or in the Home window, if you have logged in.
After logging in, run the Quality Control process.
Running Quality Control
The Quality Control (QC) process can be activated in the following places in Everest Software:
n Home window
156 | ZE5 Cell Analyzer and Everest Software