EasyManua.ls Logo

BRP Evinrude E-TEC G2 - Page 98

BRP Evinrude E-TEC G2
460 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
98
Engine and Control Systems
EMM Servicing
Remove EMM from frame.
Installation
Align slots in bottom side of EMM case with isolator mounts on the frame. Slide EMM into position.
Install J1-A, J1-B, and J2, J3, and J4 connectors.

Table of Contents

Other manuals for BRP Evinrude E-TEC G2

Related product manuals