EasyManua.ls Logo

Furuno FEA-2807 - How to Load a New ARCS Chart into the System; How to Load ARCS Charts by Permits

Furuno FEA-2807
620 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9. Raster Chart Material
9-17
9.9 How to Load a New ARCS Chart into the
System
You may load a new ARCS chart into the system for which you have a permit, by the following methods.
Load by permit. Load all the charts that are covered in your license. The system will load them automatically.
Load by active group. Define a group of charts to be loaded into the system. It can be useful to define groups
to make it easier to maintain your chart database.
Load manually. Manually load charts into the system.
9.9.1 How to load ARCS charts by permits
[Load Charts]
By Permits
By Group
Manual
Go Back
1. Select Load Charts from the Chart menu and By Permits from the sub menu.
2. Insert desired CD-ROM into the CD-ROM drive then click the Load button.
The progress indicator shows the number of charts loaded and the number of
charts to be loaded.
Progress Dialog
Chart:
89 Of 3119
126
3. Repeat step 2 until you have loaded all the CD-ROMs covered in your license.
After you have loaded all CD-ROMs, click the X on the ARCS Load window
to close the window.

Table of Contents

Other manuals for Furuno FEA-2807

Related product manuals