EasyManua.ls Logo

GE Datex-Ohmeda S/5 - To Remove the CPU Mother Board and the Module Mother Board

GE Datex-Ohmeda S/5
453 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
S/5
TM
8-Module Frame, F-CU8 -12
25
Document no. M1125635-05
When replacing the battery, make sure the + indicated battery cable is attached to the + pole
of the battery.
Dispose of the old battery according to the local regulations.
NOTE: After the battery has been replaced, it must be charged for at least 24 hours before it
reaches full capacity.
3.3.4 To remove the CPU mother board and the module mother board
To remove the Power Logic Board
1. Remove the top cover of the Power Supply Unit.
2. Remove the lead acid battery.
3. Detach the board by removing the four screws.
To remove the CPU mother board
1. Remove the Power Supply Unit.
2. Remove the four screws holding the CPU mother
board to the metal chassis.
3. Remove the CPU mother board by carefully
disconnecting the board from the connector.

Table of Contents

Related product manuals