EasyManua.ls Logo

GE Voluson E Series - Memtest (Memory Check)

GE Voluson E Series
356 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. When the following WARNING message appears, press the [<-] (Arrow left) button to highlight
OK
and
then press Enter.
Figure 5-30 Warning message
After performing the rollback, the system reboots. The Ultrasound Application is started and finally the 2D
screen is displayed on the monitor.
5.15.4 Memtest (Memory Check)
1.
Turn system OFF and then back ON.
2. As soon as the “Boot Screen” appears (see:
Figure 5-30 on page 5-53
), press the [PgDn] (Arrow
down) key on the keyboard until the Memtest item is highlighted, then press Enter.
After 3 sec. without pressing any key, the system will boot-up in windows (= Voluson item). If you missed
selection, retry again with Ctrl
+ Alt + Del.
The PC Memory Test starts automatically and takes about 2.5 hours. If there are errors they will be listed.
Figure 5-31 Memory check in LINUX
1 elapsed test time
2
list of errors
Note
After one cycle (~ 2.5 hours) the memory check starts again. To interrupt the test, press the Esc key. If you
don't interrupt the memory test , it will perform never ending cycles of memory checks.
Note
If after one cycle (about 2.5 hours), no error messages are listed, it can be assumed that the Back End
Processor including power supply is working properly.
Components and Functions (Theory)
5-54
Voluson E-Series Service Manual
5539550APB Revision 6

Table of Contents

Related product manuals