EasyManua.ls Logo

GE Voluson E Series - 8.17 Replacing optional Peripherals; How to mount Peripherals at a later date

GE Voluson E Series
356 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8.17 Replacing optional Peripherals / How to mount Peripherals at a later date
Note
Normally auxiliary devices and peripherals come pre-installed with the Voluson E-Series system.
Manpower
One person, 30 - 60 minutes (depending on peripherals)
Tools
slotted screwdriver
Preparations
Content in this section
8.17.1 Mounting/Replacing a Secondary "Patient" Monitor - - - - - - - - - - - - - - - - - - - - - - 8-29
Caution
A Secondary "Patient" Monitor MUST NEVER be connected to the Voluson E-Series systems mains supply
directly! Always connect it to an appropriate Isolation Transformer (see
Section 9.10.3 on page 9-42
).
Warning
After each installation, the leakage currents have to be measured according to IEC 60601-1, IEC 62353 or
other relevant standard.
Replacement Procedures
8-28
Voluson E-Series Service Manual
5539550APB Revision 6

Table of Contents

Related product manuals