Chapter 2
Site Preparation
This chapter provides the information required to plan and prepare for the
installation of a Voluson E-Series system. Included are descriptions of the facility
and electrical needs to be met by the purchaser.
Content in this chapter
2.1 General Requirements - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2-2
2.2 Facility Needs - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2-6
Voluson E-Series Service Manual
5539550APB Revision 6
2-1