4
Operation
Service plan before initial commissioning
Service plan before initial commissioning
Gearboxes
Check the oil level in the plane
tary transmission and check for leaks.
Chassis frame
Check the wheel fastenings
and tighten.
Check the tyre pressure.
Check the brake system.
Check the steering syste
m.
Electrics
Check the condition o
f the drive battery.
Check the emergency o
ff switch.
Hydraulics
Hydraulic system:
Check the oil level.
Check the lifting s
ystem and the attachments.
.
Instructions for running-in
The industrial truck can immediately be driven
at a brisk speed. However, in the first 50
operating hours avoid subjecting either the
working hydraulics or the drive unit to high
continuous loads.
The wheel fastenin
gs must be tightened
before the initial
commissioning and whenever
the wheels are changed. This operation must
also be performed at least every 100 operating
hours.
The wheel fast
enings must be tightened
crosswise.
Tightening torque: See chapter 5, "Inspection
and maintenance data"
54 Operating Instructions – 3888011701 EN – 12/2017