EasyManua.ls Logo

Polaris 2012 RANGER RZR 570 INTL

Polaris 2012 RANGER RZR 570 INTL
403 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.84
ENGINE / COOLING SYSTEM
9923523 - 2012 RANGER RZR 570 Service Manual
© Copyright 2011 Polaris Sales Inc.
Balance Shaft Installation / Timing
1. Position balance shaft in the crankcase.
2. Rotate crankshaft to align the timing marks ( A) as
sh
own below.
3. Fully seat the balance shaft into the crankcase and
ver
ify timing marks are correct.
Final Crankcase Assembly
1. Prepare MAG side crankcase by clean ing se aling
surface. Be sure the oil pickup and oil pressure valve
are fully installed.
2. Apply a thin film of Crankcase Sealant (PN 2871557)
evenly to
a clean and oil-free MAG crankcase mating
surface as indicate d below. Be sure alignment pins
(A) are in place.
3. Assemble MAG crankca se to PTO
crankc ase
immediately. Do not allow sealant to dry.
A
Crankcase Sealant: 2871557
A
A

Table of Contents

Related product manuals