This chapter describes how to get started with setting up the library. The information includes:
• Unpacking and Inspecting
on page 9
• Checking the Accessories
on page 10
• Initial Setup Procedure Road Map
on page 11
• Required Tools
on page 13
• Illustrations of Modules
on page 14
Unpacking and Inspecting
Use the instructions supplied with the library to unpack. All boxes packed around the library on the pallet
contain parts needed to install the library. When you remove the packing material from the parts in the base
of the module, put the parts in a safe area so they will not get damaged or lost.
Make sure you have read the Scalar i6000 Planning Guide before you start the installation procedure.
Two silver and two gold keys are shipped with each module. The gold keys (FRU ID 401) open the service
door. The silver keys (FRU ID 402) work on both the access and service doors. All modules are keyed the
same, so there is no chance that a customer who has two or more modules could end up with different keys.
All keys are to be left with the customer.
Access to the interior of the library is both a data integrity and a safety issue.