320 Installation Testing and Verification
Get/Put
The Get/Put graphical report shows the results for tests of the picker assembly while performing one get
and one put function for each tape magazine. The picker will use the selected scratch tape or the existing
tape if it finds one at the target.
• If the graphical report shows a failed result for one or more tape magazines, make sure the
magazines at the location of the failure are installed properly.
• If there are multiple marginal results in an area, review the area to make sure it is not prone to
problems. Also run the library alignment test (part of the installation verification or partial frame test)
to make sure the library properly aligned.
• If there are a large number of issues, use rubbing alcohol to clean the picker fingers and the detents
in the side of the tapes.
• If the problems persist, you may need to replace the picker assembly.
Figure 32 Get/Put Graphical Report

Table of Contents

Other manuals for Quantum Scalar i6000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Quantum Scalar i6000 and is the answer not in the manual?

Quantum Scalar i6000 Specifications

General IconGeneral
BrandQuantum
ModelScalar i6000
CategoryStorage
LanguageEnglish

Related product manuals