EasyManua.ls Logo

Quantum Scalar i6000 - 12 Installation Testing and Verification; Verifying the Hardware Installation

Quantum Scalar i6000
384 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Scalar i6000 Installation Guide 307
Installation Testing and Verification
This chapter contains testing procedures for performing the following:
Verifying the Hardware Installation
on page 307
Installation Verification Tes
t Overview on page 309
Running the Installation Verification Test
on page 325
C
ompleting the Installation Verification Checklist on page 332
Verifying the Hardware Installation
To verify the hardware, follow these steps:
1 Verify that the library is leveled based on the instructions in Installing a Stand-Alone Control Module
on
page 19 and Installing a Multi-Module Library
on page 27.
2 Close the access door.
3 Verify that the Robotics Enabled and Status indicators above the Library Management Console (LMC)
are illuminated in solid green state.
Robotics Enabled
indicator/button
Status indicator
Power indicator/button
touch screen

Table of Contents

Other manuals for Quantum Scalar i6000

Related product manuals