MULTIPHASE
LATERAL F-PLN management
23
AIRBUS A318/319/320/321
© THALES AVIONICS S.A.
J43126AA 00
If changes are made during arrival and a revision has been
made in the previous arrival: arrival procedure is re-strung from
the previous revise point; segments before the revise point becomes
part of En-route segment.
In the following example, revision has been entrered to proceed DET
after ALESO; En-route ends is now BIG. Selection of the new arrival
is re-strung from BIG; a discontinuity exists between BIG and
ALESO, start of arrival procedure.
En-route
En-route TRANS
VIA
Approach STAR
RWY 27L
CI27L
IGER
BIG07
FI27L
BIG
D139L
ALESO
BIG3B
F-PLN DISCONTINUIT
DET