ICS-3000 Ion Chromatography System
138 Doc. 065031-04 1/08
4.11 Equilibrate the System and Verify Operational
Readiness
NOTE Sample preparation can be performed while the system
is equilibrating.
1. On the Chromeleon or Chromeleon Xpress Control panel, verify that the TC
temperature is at its set point and is stable.
2. Monitor the pump pressure; make sure it is at the expected reading for the
installed column and is stable.
The system is now ready for operation.