EasyManua.ls Logo

Dionex ICS-3000 - System Startup Checklist

Dionex ICS-3000
392 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ICS-3000 Ion Chromatography System
118 Doc. 065031-04 1/08
4.2 System Startup Checklist
Set up the eluent reservoirs (see page 123)
Set up the piston seal wash system (see page 124)
Start the pump (see page 127)
Set the pressure limits (see page 130)
If an EG is installed, start the EG and set the eluent concentration (see
page 131
)
Start the DC (see page 135) or TC (see page 137)
Equilibrate the system and verify operational readiness (DC: see page 136;
TC: see page 138
)
Prepare the samples (see page 119)
Fill the autosampler vials and load the sample tray (see page 120)
Notes:
If the system is controlled by Chromeleon, you can use the SmartStartup
Wizard to create a startup program and sequence. SmartStartup allows
automatic system startup and equilibration.
The Start up button on the Home tab on the ICS-3000 panel tabset starts the
system components (pump, suppressor, eluent generator, CR-TC, detector,
etc.). The flow rate, suppressor current, and other settings that were in effect
when the system was shut down are restored.

Table of Contents

Related product manuals