EasyManua.ls Logo

Dionex ICS-3000 - EG Routine Maintenance; EG Daily Maintenance; EG Weekly Maintenance; EG Annual Maintenance

Dionex ICS-3000
392 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Doc. 065031-04 1/08 163
EG Routine Maintenance
This section describes routine maintenance procedures for the ICS-3000 Eluent
Generator (EG) that users may perform. All other maintenance procedures must
be performed by Dionex personnel.
For information about maintenance procedures for the EluGen cartridge, CR-TC
trap column, or suppressor, refer to the appropriate product manual. These
manuals are included on the Dionex Reference Library CD-ROM (P/N 053891).
7.6 EG Daily Maintenance
Locate and repair leaks inside the EG (see Section 9.11) and wipe up liquid.
Rinse dried eluents off components with deionized water.
Rinse the EG drip tray with deionized water (to prevent formation of salt
crystals) and dry the drip tray thoroughly. Rinse and dry the leak sensor, also;
if the sensor is not dry, it will remain activated and continue to report a leak to
the Audit Trail.
Check the waste container and empty as needed.
0
7.7 EG Weekly Maintenance
Check all air and liquid lines for crimping. Move (or reroute) pinched lines
and replace damaged lines (see Section 9.10
). For help in isolating the cause
of a tubing restriction, see Section 9.11
.
Monitor the system backpressure. A gradual increase in backpressure can
indicate clogging of the EluGen cartridge inlet frit from particulates in the
eluent water.
7.8 EG Annual Maintenance
Check the expiration date and remaining lifetime of the EluGen cartridge on
the EG Control panel in Chromeleon or Chromeleon Xpress.

Table of Contents

Related product manuals