ICS-3000 Ion Chromatography System
278 Doc. 065031-04 1/08
8. Insert the priming valve knob into the secondary pump head, turn the knob
clockwise, and tighten fingertight.
9. Push the component mounting panel back into the enclosure. Close the DP/SP
door.
10. Press the
POWER button on the front of the DP/SP to turn on the pump.
11. Select the Connected check box on the Control panel to reconnect the pump
to the software.
12. Click Motor on the Control panel to turn on the pump flow.
9.9 Changing the DP/SP Main Power Fuses
1. Click Motor on the pump Control panel in Chromeleon or Chromeleon
Xpress to turn off the pump flow.
2. Begin monitoring the Current Pressure reading on the Control panel. When
the system pressure reaches zero, do the following:
• Disconnect the pump from the software by clearing the Connected check
box on the Control panel.
• Press the POWER button on the front of the DP/SP for 2 seconds to turn
off the pump.
3. Turn off the main power switch on the rear panel of the pump (see
Figure 2-6
).
4. Disconnect the main power cord from both its source and from the rear panel
of the pump.
.
HIGH VOLTAGE—Disconnect the main power cord from its source and
also from the rear panel of the pump.
HAUTE TENSION—Débranchez le cordon d'alimentation principal de
sa source et du panneau arrière du pump.
HOCHSPANNUNG—Ziehen Sie das Netzkabel aus der Steckdose und
der Netzbuchse auf der Rückseite der Pumpe.