13.2.1.4 Concluding steps
Ê "Reassembling" on page 52
Ê "Connecting the server to the mains" on page 55
Ê "Enabling SVOM boot watchdog functionality" on page 78
Ê "Using the Chassis ID Prom Tool" on page 87
Ê "Switching on the server" on page 57
Ê "Verifying system information backup / restore" on page 73
Ê "Resuming BitLocker functionality" on page 84
13.3 Front VGA board
13.3.1 Installing the front VGA board
13.3.1.1 Preliminary steps
Ê "Shutting down the server" on page 45
Ê "Disconnecting the server from the mains" on page 46
Ê "Getting access to the component" on page 47
Ê "Removing the front panel module" on page 237
Upgrade and Repair Unit
(URU)
Hardware: 10 minutes
Tools: Phillips PH1 / (+) No. 1 screw driver