4.7 Switching on the server
V CAUTION!
●
Before switching on the server, make sure the top / side cover is
closed. In order to comply with applicable EMC regulations
(regulations on electromagnetic compatibility) and satisfy cooling
requirements, the server must not run while the top / side cover is
removed.
●
After connecting all power cords, wait at least 60 seconds before
pressing the On/Off button.
●
Follow the safety instructions in chapter "Important information" on
page 31.
Ê Press the On / Off button to start up the server.
Ê Ensure that the power-on indicator above the On / Off button is lit green.
Ê Perform the required procedures described in the concluding steps of each
upgrade or maintenance task.