4.4 Scenarios for Connecting the ECC800-Pro in the
Smart Module
4.4.1 Connecting a Monitoring Cable to the ECC800-Pro
Collector
Procedure
Step 1 For details about how to connect monitoring cables to the ECC800-Pro, see the
Smart Modular Data Center Management System Wiring Diagram.
NO TE
The onsite wiring diagram of the management system prevails. The method described in
this section is for reference only.
----End
iMaster NetEco
Device Installation and Commissioning Guide (Data
Center) 4 Connecting Monitoring Cables to Devices
Issue 02 (2021-05-12) Copyright © Huawei Technologies Co., Ltd. 133

Table of Contents

Related product manuals