Attaching hydraulic hoses.
a b
Fig.
47
a)
Retracting parking jack connection
b)
Extending parking jack connection
Collect escaping oil in a suitable container.
Screw provided unions (8) in the parking jack.
Unscrew the hydraulic hoses from the double nipple (9).
Note
With comfort version electronics design
The upper line is screwed on connection “a”.
The lower line is screwed on connection “b”.
For medium version electronics design
The hydraulic line marked with S1 on the hydraulic block is screwed on connection “a”.
The hydraulic line marked with S2 on the hydraulic block is screwed on connection “a”.
Screw the hydraulic hoses (5) on the unions (8).
Connect the hydraulic hoses on tractor side.
Checking the “Lifting / lowering drawbar” function. The hydraulic hoses (5) on the
parking jack must be replaced if the “Lifting /lowering” functions are interchanged.
Lower the parking jack until the machine is in horizontal position.