EasyManua.ls Logo

Krone Big Pack 890 XC - Checking; Adjusting Position of Needles - Baling Ram

Krone Big Pack 890 XC
612 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
261
Pos: 107.24.13 /B A/Einstellung en/Großpackenpr esse/Bindegar n einfädeln/ Bindeeinrichtu ng 6 Doppelknoter/ Garnrollen Un terfaden verbind en 3a, 3b und 3 c (3 Unterfä den) @ 208\ mod_1386931126 571_78.doc x @ 1720479 @ @ 1
Connecting twine rolls 3a, 3b, and 3c with each other
1 Guide the beginning of the twine of twine roll (3a) over the red eye above through the twine
brake out of the twine box.
2 Connect the beginning of the twine of twine roll (3b) with the end of the twine of twine roll
(3a) by a reef knot.
3 Guide the beginning of the twine of twine roll (3c) through the red eye above further to the
front to the next red eye and connect it with the end of the twine on twine roll (3b) by a reef
knot.
4 Shorten the ends of all reef knots to x = 15 - 20 mm.
Pos: 107.24.14 /B A/Einstellung en/Großpackenpre sse/Bindegar n einfädeln/Hi nweis Reverserolle n (R) @ 20 \mod_1239 010206160_78. docx @ 227020 @ @ 1
Note
The twine rolls (R) are auxiliary rolls. They must not be connected with other rolls.
Pos: 107.24.15 /L ayout Module /---------------Seitenumbruch---------------- @ 0\mod_1196175311226_ 0.docx @ 4165 @ @ 1

Table of Contents

Other manuals for Krone Big Pack 890 XC

Related product manuals