EasyManua.ls Logo

Krone Big Pack 890 XC - Checking; Setting Twine Bar to the Channel Slot

Krone Big Pack 890 XC
612 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
264
Pos: 107.24.32 /B A/Einstellung en/Großpackenpre sse/Bindegar n einfädeln/Ob erfaden einfä deln Bild 3 @ 155 \mod_136 3329246968_ 78.docx @ 13698 90 @ @ 1
9
10
13
12
BPHS0127
11
Fig.
164
Pos: 107.24.33 /B A/Einstellung en/Großpackenpre sse/Bindegar n einfädeln/Ob erfaden einfä deln T3 @ 155\ mod_1363329 332881_78.d ocx @ 1369919 @ @ 1
Guide the upper twine from the twine brake (9) through the eye (10) of the tensioning arm
(11).
Pull the upper twine towards the bottom and guide it between the rollers (12) of the upper
needle (13).
Pos: 107.24.34 /B A/Einstellung en/Großpackenpre sse/Bindegar n einfädeln/Ob erfaden einfä deln T3 Ist der Pre sskanal l eer @ 164\mod_ 13662740560 12_78.docx @ 1 429143 @ @ 1
If the bale channel is empty
Knot the upper twine with the lower twine in the middle of the bale chamber.
Or
Guide the upper twine under the crossbeam of the knotting mechanism and knot it on the
crossbeam of the upper bale channel flap.
To tension the tensioning arm (11), pull back the upper twine in front of the twine eye (8).
Pos: 107.24.35 /B A/Einstellung en/Großpackenpre sse/Bindegar n einfädeln/Ob erfaden einfä deln T3 Ist der Pre sskanal gefüllt @ 164\ mod_13662739906 84_78.docx @ 1429114 @ @ 1
If the bale channel is filled
Read the actual bale length on the terminal.
If the difference between actual bale length and target bale length is > 50 cm
Let the loose twine end of the upper twine hang down approx. 50cm in the bale channel.
The tensioning arm (11) is tensioned when the twine is caught in the crop at subsequent baling.
If the difference between actual bale length and target bale length is < 50 cm
Guide the upper twine under the crossbeam of the knotting mechanism and knot it on the
crossbeam of the upper bale channel flap.
To tension the tensioning arm (11), pull back the upper twine in front of the twine eye (8).
Pos: 107.25 /Layo ut Module /---------------Seitenumbruch---------------- @ 0\mod_1196 175311226_0.d ocx @ 4165 @ @ 1

Table of Contents

Other manuals for Krone Big Pack 890 XC

Related product manuals