EasyManua.ls Logo

Krone Big Pack 890 XC - Emergency Manual Activation

Krone Big Pack 890 XC
612 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Settings
315
Pos: 109.96.26 /B A/Einstellung en/Großpackenpre sse/Presskolb eneinstellung/Ra ffer zum Preß kolben Vorge hensweise alle HS TYpen a ußer 1290 HDP @ 192\mod_1 38209237753 0_78.docx @ 1 638885 @ @ 1
Adjusting packer to baling ram is only necessary if the following parts have been
disassembled:
Packer coupling (7), packer gearbox (8), chain coupling (9),
Transfer gearbox (10) (or removal of the drive train transfer gearbox to main gearbox (11))
Crank arm (13) from the main gearbox
The packer (1) is correctly set to the baling ram (2) if the piston rod (3) is in its extended position
(a) and the large packer strip roller (4) running in front of the feeder strip (5) is X=6cm under the
control window (6).
Prerequisites:
The packer coupling is locked in place, refer to chapter entitled “Checking Packer
Coupling”.
The VFS system is in zero position, refer to chapter entitled Settings “Zero Position”.
Move packer strip (4) into position, refer to chapter Settings “Moving Packer Strip into
Position”.
Move the baling ram into position, refer to chapter Settings “Moving Baling Ram into
Position”.
Pos: 109.96.27 /L ayout Module /---------------Seitenumbruch---------------- @ 0\mod_1196175311226_ 0.docx @ 4165 @ @ 1

Table of Contents

Other manuals for Krone Big Pack 890 XC

Related product manuals