EasyManua.ls Logo

Krone Big Pack 890 XC - Preparations for Road Travel

Krone Big Pack 890 XC
612 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
117
Pos: 97.50 /Übersc hriften/Überschrif ten 4/A-E/ Ballenbre mse @ 324\mod _1425459464877_ 78.docx @ 24 92307 @ 4 @ 1
8.7.1.1 Bale Brake
Pos: 97.51 /BA/Be dienung /Groß packenpresse /Ballenbrems e/Ballenbremse_Te xt @ 324\ mod_14254590 91066_78.doc x @ 2492136 @ @ 1
Only in combination with bale scale
b
a
1
BPHS0068
Fig.
58
The first two rolls of the bale chute are locked via bale brake (1). This is necessary to reach an
exact weight control of the bales.
Lever in position a = rolls blocked
Lever in position b = rolls can be freely rotated
Note
To ensure that the last bale can be put down properly, the bale brake must be released for the
last bale.
Pos: 98 /Layout M odule /---------------Seitenumbruch---------------- @ 0\mod_119617531 1226_0.docx @ 4165 @ @ 1

Table of Contents

Other manuals for Krone Big Pack 890 XC

Related product manuals