EasyManua.ls Logo

Krone Big Pack 890 XC - Setting the Twine Tension on the Upper Twine Strand (Double Knotter)

Krone Big Pack 890 XC
612 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
269
Pos: 107.39 /BA /Bedienung /Groß packenpress e/Ballenaussc hieberBallena usschieber bedie nen, bei Ausführu ng Komfort BiG PACK 890/ 1270/1290 Text @ 356\mod_ 14386887570 58_78.docx @ 26 53157 @ @ 1
Operating the bale ejector via the operating terminal with the comfort electronics version
Fig.
170
For version without load sensing: Actuate the control unit ( ).
The key has several functions.
If the bale channel flaps have not been actuated
To loosen the bale channel flaps, press .
If the bale channel flaps have been actuated
To execute 10 bale ejections, press .
Repeat the process until all tied bales are out of the bale channel.
Pull the last bale manually off the bale chute.
Pos: 107.40 /Layo ut Module /---------------Seitenumbruch---------------- @ 0\mod_1196 175311226_0.d ocx @ 4165 @ @ 1
BPHS0138

Table of Contents

Other manuals for Krone Big Pack 890 XC

Related product manuals