Operation
250
Pos: 107.7 /BA/Be dienung /Groß packenpresse/M it dem Pressen beginnen / nac h dem Press en @ 166\mo d_136722349 9536_78.docx @ 1441233 @ @ 1
Starting baling
Prerequisite:
– The conditions mentioned in “Preparation for Baling” and “Before starting baling, check to
make certain ...” are fulfilled.
Baling
• Turn on the P.T.O. shaft at minimum speed.
• Slowly increase the P.T.O. speed to 1000 min
-1
.
• Wait until the pre-selected bale channel flap pressure is reached in the terminal before
driving up into the swath for the first time.
The bale channel must be completely filled in order to bale in automatic mode. This is best
accomplished by baling the first two bales in manual mode.
• Switch to automatic mode in the terminal after the second bale has been baled.
• Adjust the baling force in automatic mode.
After baling
• Release the bale brake on the bale chute for the bales which have been tied at last,
optional.
• Lay down the bales being tied at last on the field.
• Clean the machine.
• Prepare the machine for road travel.
Pos: 107.8 /La yout Module /---------------Seitenumbruch---------------- @ 0\mod_11961 75311226_0.doc x @ 4165 @ @ 1