EasyManua.ls Logo

Motion Control Engineering Motion 4000

Motion Control Engineering Motion 4000
459 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
2-80 Manual # 42-02-2P24
To change the top mounting arm from left to right side:
1. Set the hanger arm assembly on a working surface so that the hanger plate is on your
right.
2. Remove the two 1/2” bolts that secure the top hanger plate.
3. Flip the plate top-to-bottom so that the tape attachment hole is on the bottom.
4. Reassemble with the hanger plate extending beyond the end of the bracket by about
1 and 1/4 inches.
5. Torque the 1/2” bolts to 20 ft-lbs.
Figure 2.31 Changing the Top Mounting Arm from Left to Right Side
Channel
Hanger plate
1/2” twirl nuts
1/2” x 7/8” bolts
1-1/4 inches
RIGHT
Channel
Hanger plate
1/2” twirl nuts
1/2” x 7/8” bolts
1-1/4 inches
LEFT

Table of Contents

Related product manuals