Prepare for Inspection Operation
2-51
2
Motion 4000
Prepare for Inspection Operation
Once the car is running safely on construction operation, you should next install all safety string
components in accordance with the job drawings package. The actual equipment in the string
may vary from job to job but for the Motion 4000 generally includes:
• Hoistway safety string -
•Governor switch
• Final Limit switches
•Buffer switches
• Compensation sheave switch
•Pit stop switch
• Cartop safety string -
• Safety clamp switch
• Emergency exit contact
• Cartop Inspection station and Stop switch
• In-Car Stop switch (in COP)
•Hoistway Switches
At this point, you should also:
• Install seismic equipment

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Motion Control Engineering Motion 4000 and is the answer not in the manual?

Motion Control Engineering Motion 4000 Specifications

General IconGeneral
BrandMotion Control Engineering
ModelMotion 4000
CategoryController
LanguageEnglish

Related product manuals