EasyManuals Logo

Polaris 2012 RANGER RZR 570 INTL User Manual

Polaris 2012 RANGER RZR 570 INTL
403 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #276 background imageLoading...
Page #276 background image
7.34
FINAL DRIVE
9923523 - 2012 RANGER RZR 570 Service Manual
© Copyright 2011 Polaris Sales Inc.
18. Install an d tighte n the la rge cla mp u sing the
appropriate clamp tool.
19. While pulling out on the CV s
haft, slide a straight O-
ring pick or a small slotted screw driver between the
small end of the boot and the shaft. This will allow the
air pressure to equalize in the CV boot in the position
that the joint will spend mos t of its life. Before you
remove your instrument, be sure the small end of the
boot is in its correct location on the shaft.
20. Install and tighten the small clamp on the boot using
th
e appropriate clamp tool.
Axle Boot Clamp Tool: PU-48951
or
CV Boot Clamp Pliers: 8700226
Axle Boot Clamp Tool: PU-48951
or
CV Boot Clamp Pliers: 8700226

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Polaris 2012 RANGER RZR 570 INTL and is the answer not in the manual?

Polaris 2012 RANGER RZR 570 INTL Specifications

General IconGeneral
BrandPolaris
Model2012 RANGER RZR 570 INTL
CategoryOffroad Vehicle
LanguageEnglish

Related product manuals