Conforming and Reconforming : Reconform
22 - 556
The Reconform Project dialog opens proposing the creation of two new Change Tracking Tracks:
Select all Tracks that will have to be reconformed (generally all Tracks in the project).
Tick the Create Changes Tracking Tracks box if these are required.
Click on OK to perform the Reconform.
Pyramix Reconform from Change EDL dialog