256 Adding Optional Hardware
24 Gather the Fibre optical cables and put them inside the Velcro straps that are mounted on the right side
of the module.
25 Detach the ESD strap and close the door.
26 To turn on power to the library, press the Power button on the indicator panel.
The library begins to boot up. Within five minutes, the LMD display appears on the library’s touch
screen. A library with only a few drives usually will be fully powered on and ready for use within 10
minutes. However, if a library is large with a high number of drives, it can take more than an hour for the
library to fully power on, complete its discovery process, and become ready for use. During the power-
on process, the Robotics Enabled indicator flashes. When the library is fully up and ready to receive
commands, the Robotics Enabled indicator turns solid green.
use Velcro straps
to secure cables