EasyManua.ls Logo

Svantek SVAN 979 - Page 152

Svantek SVAN 979
377 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
152
SVAN 979 User Manual
General Settings
General measurement settings: Start Delay, Start Sync.,
Integration Period Inf., Integration Period, Repetition
Cycles, RMS Integration, Day Time Limits and
Rolling Time.
Chapter
4.1
Start Delay
Delay between pressing the <Start> key and the start of
measurement integration.
Chapter
4.1
Start Synch.
Synchronization of the measurement/integration start to
the nearest full minute or hour of the instrument real-time
clock. It helps to measure in full cycles.
Chapter
4.1
Integr. Period Inf
Infinitive averaging of Summary Results that lasts from
start of the measurement till its cancellation with the
<Stop> key or remotely.
Chapter
4.1
Split Cycles
Maximum number of logger files if integration period is
infinite.
Chapter
4.1
Integration Period
Time of averaging of Summary Results: from 1 second
to Infinitive. For example, with 8 hours integration period
the LEQ result will be averaged for 8 hours. In case of
Infinitive, the measurement will last until the user presses
the <Stop> key.
Chapter
4.1
Repetition Cycles
Number of measurement/integration repetitions after the
<Start> key pressure.
This enables to make a series of measurements without
pressing the <Start> key and save this series in the
results file.
Chapter
4.1
RMS Integration
Type of integration of RMS based results (RMS
detector): Linear or Exponential. The IEC 61672-1:2013
standard requires Linear integration, without time
weighting, however in some countries old regulation
refers to the Exponential RMS integration with standard
time weighting: Fast or Slow.
Chapter
4.1
Linear
Linear type of integration of RMS based results (RMS
detector), without time weighting according to the
IEC 61672-1:2013 standard.
Chapter
4.1

Table of Contents

Related product manuals