4-8 Qualitek mR Owner’s Guide
4.3 Fast-Track Setup
Connect clean, dry supply air.
Connect peripheral devices, if any.
Connect the power cord and turn on Qualitek mR.
Turn the security lock switch to the Program position.
Set the units of measure to use for pressure, flow volume, and flow time.
Ensure the clock is set correctly for date and time (Hardware Setup: Clock)
Enter test parameters for the first program to run.
Enter test parameters for additional programs if you are using more than one
program.
Set communication values for the connected peripherals, if used.
Turn the security lock switch to Run position. Qualitek mR is now ready to use.
4.3.1 Put Qualitek mR to Work
When everything is programmed and checked out, you’re ready to put Qualitek mR to
work and start testing products. A few tips:
• Explain controls and run display messages to operators.
• Keep external connections to the product under test as straight, rigid, and direct
as possible. Flexible connections can cause inconsistent readings.
• Put the Qualitek mR in a place where the pressure regulator and other controls
on the back won’t get moved around or damaged.