65K510DEP08-1A A-1
Appendix A
Link Aggregation Guide
Scope of this Appendix
Thisappendixdetailsthestepsneededtoprovision/removelinkaggregation.Net1andNet2
oftheGigESMcanbecombinedtoprovidea2Gbpsconnectiontoupstreamnetwork
equipment.
•Alinkaggregationgroupcannotbeconnectedinthedownstreamdirection
toanysubtendednodes.
•EnsureallfrontpanelportsontheActiveandStandbyswitchmodulesare
physicallyconnectedtotheupstreamnetworkingequipment.
In this Appendix
Thisappendixcontainsthefollowingtopics:
Table A-1. Appendix A Topics
Topic See Page
LinkAggregationProvisioning A‐2
RemoveLinkAggregationProvisioning A‐6