Total Access 5000 Business Services Deployment Guide
2-2 65K510DEP08-1A
Tools Required for Chassis Installation
Thetoolsrequiredtoinstallthechassisareasfollows:
•A#2phillips‐headscrewdriver
•Crimpingtoolforpowerlugs
•Wirestrippers
•Wire‐wraptool
•Sidecutters
•Torquewrenchwitharangefrom2to37inch/pounds
• Ohmmeter
Theitemsrequiredtoinstallthechassisareasfollows:
•Screwsformountingthechassistothe
CentralOffice(CO)racks
•Insulatedwire,stranded,copper,(2AWGto6AWG)thatisatleastequaltothesamesize
ofthepowerwireforgroundingthechassistotheframe
• DatacablesterminatedfortheTotalAccess500050‐pinor64 ‐pinconnections
•Insulatedwireforpowerconnections
Topreventelectricalshock,donotinstallequipmentinawe t locationor
duringalightningstorm.
ElectrostaticDischarge(ESD) candam ageelectronicmodules.Before
handlingmodules,we ar anantistaticdischarge wrist strap toprevent
damagetoel ectroniccomponents.Placemodulesinantistatic packing
materialwhentransportingorstoring.Whenworkin gonmodules,always
placethemonanapprovedantistaticmatthatiselectricallygrounded.