CHAPTER 7: PROTECTION PROTECTION FLEXLOGIC
D90
PLUS
LINE DISTANCE PROTECTION SYSTEM – INSTRUCTION MANUAL 425
PHASE TOC1 OP B ......................................
Asserted when phase B of the phase time overcurrent 1
element operates.
PHASE TOC1 OP C ......................................
Asserted when phase C of the phase time overcurrent 1
element operates.
PHASE TOC1 PKP........................................
Asserted when at least one phase of the phase time
overcurrent 1 element picks up.
PHASE TOC1 PKP A....................................
Asserted when phase A of the phase time overcurrent 1
element picks up.
PHASE TOC1 PKP B....................................
Asserted when phase B of the phase time overcurrent 1
element picks up.
PHASE TOC1 PKP C....................................
Asserted when phase C of the phase time overcurrent 1
element picks up.
PHASE TOC2 to 6 ........................................
Same set of operands as shown above for the phase time
overcurrent elements 2 through 6.
Phase undervoltage operands
PHASE UV1 DPO .........................................
Asserted when at least one phase of the phase undervoltage 1
element drops out.
PHASE UV1 DPO A .....................................
Asserted when phase A of the phase undervoltage 1 element
drops out.
PHASE UV1 DPO B .....................................
Asserted when phase B of the phase undervoltage 1 element
drops out.
PHASE UV1 DPO C .....................................
Asserted when phase C of the phase undervoltage 1 element
drops out.
PHASE UV1 OP.............................................
Asserted when at least one phase of the phase undervoltage 1
element operates.
PHASE UV1 OP A.........................................
Asserted when phase A of the phase undervoltage 1 element
operates.
PHASE UV1 OP B.........................................
Asserted when phase B of the phase undervoltage 1 element
operates.
PHASE UV1 OP C.........................................
Asserted when phase C of the phase undervoltage 1 element
operates.
PHASE UV1 PKP...........................................
Asserted when at least one phase of the phase undervoltage 1
element picks up.
PHASE UV1 PKP A.......................................
Asserted when phase A of the phase undervoltage 1 element
picks up.
PHASE UV1 PKP B.......................................
Asserted when phase B of the phase undervoltage 1 element
picks up.
PHASE UV1 PKP C ......................................
Asserted when phase C of the phase undervoltage 1 element
picks up.
PHASE UV2....................................................
Same set of operands as shown above for the phase
undervoltage 2 element.
Permissive overreach transfer trip (POTT scheme) operands
POTT OP..........................................................
Asserted when the permissive over-reaching transfer trip
scheme operates.
POTT TRIP 3P................................................
Asserted when the permissive over-reaching transfer trip
scheme operates to trip all three phases.
POTT TRIP A...................................................
Asserted when the permissive over-reaching transfer trip
scheme operates to trip phase A.
POTT TRIP B...................................................
Asserted when the permissive over-reaching transfer trip
scheme operates to trip phase B.