EasyManua.ls Logo

GE LOGIQ P6 Series

GE LOGIQ P6 Series
484 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE HEALTHCARE
DIRECTION 5394152, Revision 5
LOGIQ™ P6/P6 PRO SERVICE MANUAL
Page 3-12 Section 3-4 - Preparing for Installation
3-5-1-1 Scanner Power On (cont’d)
4.) Press the ON/OFF
key at the front of the System once.
3-5-1-2 Power Up Sequence
1.) The Start Up Screen will be shown on the Monitor display when the system is turned ON.
2.) After initialization is complete, all lighted buttons on the Control Panel light and the default B-Mode
screen or Patient screen (no probes are connected) is displayed on the monitor display.
Figure 3-9 Power On/Off Switch Location
Figure 3-10 Start Up Screen Display

Table of Contents

Related product manuals